Rows of DECEL retarders with freight wagons in the background at Gävle marshalling yard

Gävle Marshalling Yard

1991
Gävle, Sweden
Hump yard
Project info

Region

Gävle, Sweden

Client

Trafikverket

Year

1991

Yard type

Hump yard

Classification tracks

18

Scope

960 retarders

Status

In operation

DECEL's role

Project management of simulations and dimensioning, manufacturing of retarder components, installation supervision

When the Swedish Transport Administration, Trafikverket, built a new marshalling yard in Gävle, it needed a system that could brake freight wagons safely and predictably, year after year. DECEL designed, manufactured and installed 960 retarders while parts of the yard remained in operation. More than 30 years later, wagons are still shunted with the same precision and at a low noise level.

Background: a new yard with high demands

In the early 1990s, Gävle got an entirely new marshalling facility with 18 classification tracks. Trafikverket wanted a yard that could handle large traffic volumes with high availability, where wagons roll at a controlled speed and staff work in a quieter environment than at older yards. The requirements were both operational and environmental.

DECEL was chosen for its experience in speed control of freight wagons and a solution that combines safety, reliability and lower noise.

The result in numbers
960 retarders

Supplied and installed

30+ years

In service since 1991

100%

Delivered on plan, with parts of the yard in operation throughout the installation

The challenge

Rebuilding without closing

The hardest part of the project was not the technology but the timing. Parts of the yard had to stay in service throughout the installation. Every step had to be planned so that trains could keep being shunted while new retarders were mounted a few tracks away. Had it gone wrong, Gävle would have faced delays and disruptions to freight traffic for a long period.

The solution

960 retarders in stages

DECEL managed the simulations and dimensioning, manufactured the retarder components and supervised the installation on site. The work was carried out in stages in close cooperation with the other contractors in the yard project, always with the ongoing operation in mind. Once all 960 retarders were in place, the facility was tested and commissioned.

The result

A facility built to last

The project was delivered as planned, despite the requirement to keep the yard running. The outcome is a marshalling facility where wagons are braked evenly and predictably, with lower noise levels for the people who work there. That the installation is still in service more than three decades later says most of what needs to be said about the quality of the design.

See also Helsingborg Marshalling Yard and Ånge Marshalling Yard, two other Trafikverket facilities supplied by DECEL.

Ord

“For us, sustainability is not only about new technology. It is about designing solutions that operate reliably for decades, require minimal maintenance, and help reduce wear and damage to rolling stock and rail infrastructure. By improving operational efficiency and lowering life-cycle costs, we contribute to more sustainable rail yard operations."

Operations Manager, Hallsberg Yard

Explore more inspiring our real projects

Tracks and switches at Helsingborg marshalling yard
Trafikverket
Hump yard

Helsingborg Marshalling Yard

1974
Sweden
View case
DECEL retarders in the tracks at Ånge marshalling yard
Trafikverket
Hump yard

Ånge Marshalling Yard

1985
Sweden
View case
Fitters in helmets and hi-vis vests reviewing the work out on the yard

Capacity limits or rising safety risks?